East Boston
This project is the third phase of a multi year sewer separation project in East Boston. These projects are being undertaken to separate the combined sewer system by installing new sewer and drain pipes. This will improve water quality by reducing the number and volume of combined sewer overflows.
Construction on these projects will take place under separate contracts broken into various project areas. Construction is expected to continue through 2030.
Please see the linked Project Documents to view the status of the current project as well as the overview map of futures phases
Project Contacts
Contract Number:
19-309-002Project Summary
Street Limits
Cottage Street Maverick St to Everett St |
Everett Street Orleans St to # 10 Everett St Everett Street Cottage St to #66 Everett St Everett Street Cottage St to #124 Everett St |
Maverick St Bremen St to Orleans St |
Maverick St Cottage St to Geneva St |
Maverick St McKay PL to Cottage St |
Maverick St McKay PL to Frankfort St |
McKay PL Maverick St to End |
Orleans Street Gove St to Maverick St Orleans Street Maverick St to Summer St |
Porter Street Chelsea St to Porter St |
Sumner Street #292 Sumner St to Wilbur Ct |
Sumner Street Seaver St to Cottage St |
Webster St Orleans St to #74 Webster St |
West Eagle Street Meridian St to Brooks St |
Anticipated Impacts
The anticipated impacts include water service interruptions, noise, traffic and parking modifications, rodent activity, dust and general construction impacts. The contractor will be required to minimize impacts to the extent feasible.
Surface Restoration
Temporary restoration of roadways, sidewalks and other areas disturbed by construction will be completed under this contract. Concrete or brick sidewalks will be restored within six weeks, weather dependent. Permanent restoration will occur under a separate paving contract.